Assembly system.

  • Spring assembly
  • Fully automatic assembly of contact parts
  • Integrated stamping process
  • Integrated bending process
  • 2K bonding with storage for curing of 80 minutes
  • Integrated testing for switching characteristics and contact resistance
  • Geometry and assembly control via camera systems
  • Laser marking with batch tracking and packaging
  • Detection of tolerance position of the single parts and automatic correction regarding the position for the assembly in real time
  • Output: 80 parts/min
Back to overview